Brazil’s first Gripen F reaches final assembly line as delivery edges closer
Brazil sealed its Gripen F deal at almost half the cost of either Dassault’s or Boeing’s offering. (Photo: Isac Nóbrega/PR)
The first JAS 39F Gripen two-seater fighter jet for the Brazilian Air Force (FAB) has reached the final stage of the assembly line at Saab’s Linkoping facility in southern Sweden.
Providing a media tour on 20 May at the facility where Saab assembles the more than 17,000 parts of the Gripen fighter, Matti Olsson, head of production at Saab aeronautics, said that the first F model for the FAB was undergoing air worthiness testing which usually takes between three-to-five days.
Before rolling to the next stage, fighters were nearly ready, with the engine and radars being fitted. The engine, a General Electric
Our news & analysis is now part of Defence Insight®
A Basic-level or higher Defence Insight subscription is now required to view this content.
More from Air Warfare
-
SOF Week 2026: US Army to conduct trials with Mountain Horse’s containerised drone launcher
The Mountain Horse Containerised Autonomous Drone Delivery System has been engineered for dispersed, forward UAV operations. It can store, protect, charge, launch and recover drones.
-
British Army's Project Nyx progress reflects MoD investment in autonomous system
The UK MoD said it would narrow down the competitors from four to two later in the year, with those selected going on to develop the prototype drone that will operate as loyal wingman to the British Army’s Apache AH-64E helicopters.
-
UH-60M Black Hawk: export demand underpins $13 billion market opportunity
The UH-60M is the latest variant of the UH-60, a workhorse multirole helicopter that continues to attract further orders from across the globe. With further modernisation upgrades underway, the platform is expected to remain in operation until 2050.